Mobility on Demand (MOD) Sandbox Demonstrations Independent Evaluations (IE)

TSRC and Booz Allen Hamilton are partnering to form the IE team for the MOD Sandbox Demonstrations (Task Order 1). The IE team is working to finalize the Evaluation Plans for each of the eleven (11) projects. So far, four (4) of the reports have been published, which can be found below:

BART Integrated Carpool to Transit Access Program Evaluation Cover Page    DART - The First and Last Mile Solution Evaluation Plan Cover Page

Pierce Transit Limited Access Connections Evaluation Plan Cover Page    VTrains Open Trip Planner Evaluation Plan Cover Page